Project Time CalculatorProject Time Calculator

Changelog: Corrections and Material Changes

A dated record of corrections and material changes. Formula or wording errors are marked Correction.

This page records corrections and material changes. Formula results that were wrong, or statements that did not match the code, are marked Correction. SEO and navigation changes are marked Change.

11 November 2026 — authentic information

No URL, title, H1, meta description or slug was changed. Claims that could not be sourced were labelled as rules of thumb or removed. Review lines now say “Written by”; there is no independent reviewer.

The homepage and duration-calculator meta descriptions still mention browser-only calculation; those strings were left unchanged under the SEO protection rule. The visible body text above matches the code.

3 November 2026

Change — content and crawl-priority updates (new guides, related links, sitemap batching). Formulas and rounding were not changed. Details of that batch are not restated here.

Written by . Last updated 11 November 2026.