Example 1: 9:00 to 17:00 with a 30-minute break
Clock time 8 hours, unpaid break 0.5, paid = 7.5 hours (7:30). Five days = 37.5 hours. These are the mini-calculator defaults and the 9-to-5 shift page.
Start, end and unpaid break to paid hours, including shifts that cross midnight, with weekly totals and links to named shift pages.
Work hours for a shift are clock time minus unpaid break. 9:00 to 17:00 with a 30-minute lunch is 7.5 paid hours, 37.5 for five days. If the end is earlier than the start, the shift ran past midnight. Overtime is whatever your week total exceeds the overtime-after figure.
Paid hours = clock hours − unpaid break.
This page is the shift: start, end, break, days per week. It is not project duration. For a project finish date use the project time calculator. For a named pattern such as 9 to 5, open the common work shifts hub. The full tool is the work hours calculator.
clock minutes = end − start (add 24 hours if end is before start)
paid minutes = clock minutes − unpaid break
Weekly paid hours = paid hours × days per week. Monthly and yearly figures on the tool use 52 weeks ÷ 12 months.
Each example uses numbers you can load into the calculator above; the results match the tool exactly.
Clock time 8 hours, unpaid break 0.5, paid = 7.5 hours (7:30). Five days = 37.5 hours. These are the mini-calculator defaults and the 9-to-5 shift page.
The end is before the start, so add 24 hours: 12 hours on the clock. Paid = 12 − 0.75 = 11.25 hours (11:15). Five nights = 56.25 hours. See 7 PM to 7 AM.
If you only have durations, add them with how to add hours and minutes or the add and subtract time calculator. If you have two clock times and no break rule, use the elapsed time calculator.
The work hours calculator treats overtime as weekly paid hours above a threshold, multiplied by a rate such as 1.5 for pay-equivalent hours. It does not know your contract. Check the threshold your employer uses before you quote pay.
When the end time is earlier than the start, the shift crossed midnight. Add 24 hours to the end, then subtract as usual: 22:00 to 06:00 is 8 hours on the clock. If an unpaid meal of 30 minutes sits in the middle, paid time is 7.5 hours. Do not subtract the break from only one side of midnight; subtract it once from the total. Split shifts (afternoon, unpaid gap, evening) are two intervals: calculate each, then add. The work-hours tool does one start and one end. Two intervals belong on elapsed time or on a timesheet add. Common patterns such as 9am to 5pm and 7pm to 7am have their own pages under work hours so you can bookmark a shift without retyping it.
Daily paid hours × days per week is the weekly figure. A 52-week year times that weekly figure is a rough year; divide by 12 for a month. Those are attendance hours, not project duration. A project that needs 120 hours of effort from a person who is in the office 37.5 hours a week still has to skip weekends and holidays when you place it on a calendar. Convert effort hours to working days on the hours to working days calculator, then count those days from a start date on the project duration calculator. Mixing “I work 8 hours a day” with “the project is 8 hours” is how a one-day job becomes a one-week rumour.
Subtract start from end, add 24 hours if you crossed midnight, then subtract unpaid break. Multiply by the number of days you work that pattern.
7.5 paid hours with a 30-minute unpaid lunch; 8 if lunch is paid.
Add 24 hours to the end time, then subtract as usual. 22:00 to 06:00 is 8 hours on the clock.
Weekly = daily paid hours × days per week. The calculator also shows a 52-week year and that year divided by 12 for a month.
Add them as hours and minutes. You do not need start and end times.
No. Shift hours are a workday. Project duration is effort or a date window. Use the matching calculator.