Glossary of Project Time Terms
One page per term: a definition, the formula, a mini-calculator where it helps, and a link to the tool that owns the calculation.
Glossary pages are 150–300 words. They capture definitional queries so the tool pages can stay focused on calculation. They are not a second set of calculators. Read the term, try the mini-calculator, then open the owning tool for a full table.
Browse all guides for longer how-tos, or the project time calculator for duration from effort.
Schedule network
- Slack — Total float: LS − ES.
- Float — Total float and free float.
- Lag — A planned wait on a link.
- Lead time — Overlap before a predecessor finishes.
- Critical path — The longest chain, zero float.
- Earliest start — Max predecessor EF, or 0.
- Earliest finish — ES + duration.
- Latest start — LF − duration.
- Latest finish — Min successor LS, or project duration.
- Crashing — Pay to cut time on the critical path.
Estimates and forecasts
- Expected time — PERT TE = (O + 4M + P) ÷ 6.
- Variance — σ = (P − O) ÷ 6; variances add.
- Schedule buffer — Extra effort reserved once, not twice.
- SPI — EV ÷ PV, then planned ÷ SPI.
- Velocity — Points finished per sprint.
Written by Umesh Manral. Last updated 10 November 2026.