Project Duration Calculator (Start Date to End Date)
Enter a start date and an end date to count calendar days, working days, hours and optional phases, with weekends and holidays skipped.
Quick answer
Project duration between two dates is the count of working days in that range, including both the start and the end. Weekends and the holidays you list are skipped. Hours equal working days times hours per day. Optional phases split those days so the percentages add up exactly to 100%.
How to read your result
Enter a start date and an end date. The calculator counts every selected weekday in that window, drops the holidays you paste, and multiplies the remaining days by hours per day.
Calendar days: end minus start, plus one. Both dates are counted.
Working days: calendar days that fall on a selected weekday and are not a holiday.
Total working hours: working days × hours per day. The same hours apply to every working day.
Buffered working days: shown only if you enter a buffer, as ⌈ working days × (1 + buffer %) ⌉. The count itself is not changed.
Phases: percentages of the working-day total. Days are allocated with the largest-remainder method so they add up exactly. Phase dates walk the working-day calendar in order.
working days = count of dates in the range that are a selected weekday and not a holiday
hours = working days × hours per day
buffered days = ⌈ working days × (1 + buffer % ÷ 100) ⌉ (shown separately)
Phases must total 100%. Each phase is first given ⌊ percentage × working days ⌋ days. Any leftover days go to the phases with the largest leftover fractions, so the phase days add up exactly. Phase start and end dates are the first and last working days in that slice, walking the calendar in order.
Example 2 (realistic): a 60-day window with holidays and phases
A 60-day delivery from Monday 5 January 2026 to Thursday 5 March 2026, eight hours a day, skipping 19 January and 16 February, with a 10% buffer. Phases: Discovery 15%, Build 55%, Test 20%, Launch 10%.
Calendar days = 60
Working days = 44 weekdays minus the two Monday holidays = 42
Hours = 42 × 8 = 336
Buffered working days = ⌈42 × 1.10⌉ = 47 (shown separately; the 42-day count does not change)
Use this calculator when the window is already decided — a contract period, a school term, a sprint calendar you cannot move — and you need the working time inside it. Use the project time calculator when the effort is known and the finish date is what you are solving for. Textbook problems that mix people, person-days and rates live on project time word problems. Gaps on the clock, not on the calendar, belong on the elapsed time calculator.
How to count project duration by hand
Write both dates. Count them both: 2 November to 13 November is 12 calendar days, not 11.
Mark the working weekdays. On a Monday-to-Friday week, drop Saturdays and Sundays.
Drop holidays that fall on a working day. A holiday on Saturday does not change the count.
Multiply remaining days by hours per day if you need hours.
If you split the work into phases, give each phase a percentage that totals 100, take the whole-day part of each share, then hand leftover days to the largest fractions so the days add up.
Assumptions, limits and common mistakes
Assumptions and limits
Holidays are the list you type. There is no country holiday database.
Every working day uses the same hours per day. Part-days and overtime are not modelled.
Start and end are both counted. Tools that count exclusive end dates will show one fewer calendar day.
Phases run in the order you enter them along the working-day calendar. They do not overlap or run in parallel.
Common mistakes
Forgetting that both dates count. End − start without the +1 understates a window by one day.
Forgetting holidays that fall on a weekday. They look like working days until you remove them.
Phase percentages that do not total 100%. The calculator stops rather than silently rescale them.
Treating calendar days as working days. A 60-day window on a five-day week is not 60 days of work.
Frequently asked questions
How do you calculate project duration between two dates?
Count every date from the start through the end (inclusive), keep the weekdays you work, drop holidays, and multiply by hours per day if you need hours.
Are the start date and the end date both counted?
Yes. Calendar days = end − start + 1. A project that starts and ends on the same working day is one working day.
How are weekends and holidays handled?
Unselected weekdays (weekends on a Monday-to-Friday week) are skipped. Holidays you paste are skipped if they fall on a selected weekday. A holiday on a weekend is not counted twice.
How are project phases split across the dates?
Each phase gets a percentage of the working days. Whole days are allocated first; leftover days go to the largest remainders so the phase days add up exactly. Dates then walk the working-day list in order.
What if my phase percentages do not add up to 100%?
The calculator shows an error and does not guess. Adjust the percentages until they total 100.
Does a buffer change the working-day count?
No. The buffer is shown as a separate rounded-up figure, ⌈ working days × (1 + buffer %) ⌉, so you can see the padded plan without hiding the raw count.
Can I use a Sunday-to-Thursday week?
Yes. Tick the weekdays you work. A Sun–Thu week treats Friday and Saturday as non-working.
Is anything sent to a server?
The count runs in your browser. Download CSV and copy-result stay on your device. A shared link puts the dates in the page address, so anyone who opens it, and our server logs, can see them. Google Analytics receives event names, not the dates you enter. See the privacy policy.