Project Time Calculator

How Many Hours Is 7 PM to 5 AM?

7 PM to 5 AM with a 45-minute unpaid break is 9.25 paid hours a day (9:15), or 46.25 hours over a five-day week.

Earlier than the start means the shift ends the next day.
Total unpaid break per day.
Leave empty for no overtime.
Pay-equivalent hours only.
Log hours per task (optional)

One task per line, ending with the time as h:mm or decimal hours, for example Design review, 1:30.

7 PM to 5 AM: hours by day, week, month and year

You are at work for 10:00 (10 hours) each day, and because the shift passes midnight it belongs to two calendar dates and paid for 9:15 (9.25 hours) once the 45-minute unpaid break is taken off. Multiply by the days you work to get the longer periods below. A month is the weekly total times 52 divided by 12, which is 4.33 weeks, and a year is 52 weeks with no unpaid leave removed.

Paid hours for 7 PM to 5 AM
PeriodPaid time (h:mm)Decimal hoursTime at work incl. break (h:mm)
One day9:159.2510:00
One week, 5 days46:1546.2550:00
One week, 4 days37:003740:00
One month (5 days)200:25200.42216:40
One year (5 days, 52 weeks)2405:002,4052600:00

Your day on the clock: 7 PM to 5 AM

The table assumes the 45-minute break starts when half of the paid time is done, at 11:38 PM. Move the break and every later time shifts with it. You complete 9.25 paid hours by 5:00 AM (next day), the morning after you clocked in.

Clock times for 7 PM to 5 AM
MilestoneClock timePaid time so far (h:mm)
Clock in7:00 PM0:00
Paid hour 1 complete8:00 PM1:00
Paid hour 2 complete9:00 PM2:00
Paid hour 3 complete10:00 PM3:00
Paid hour 4 complete11:00 PM4:00
Break begins11:38 PM4:38
Break ends12:23 AM (next day)4:38
Paid hour 5 complete12:45 AM (next day)5:00
Paid hour 6 complete1:45 AM (next day)6:00
Paid hour 7 complete2:45 AM (next day)7:00
Paid hour 8 complete3:45 AM (next day)8:00
Paid hour 9 complete4:45 AM (next day)9:00
Clock out5:00 AM (next day)9:15

How the break changes 7 PM to 5 AM

The same 10:00 on the clock gives a different paid total depending on how long you are unpaid for. Each extra 15 minutes of break takes 1.25 hours off a five-day week and 65 hours off a 52-week year.

Paid time for 7 PM to 5 AM by break length
Unpaid breakPaid per day (h:mm)Decimal hoursPer week, 5 daysPer year, 52 weeks
0 minutes10:0010502,600
15 minutes9:459.7548.752,535
30 minutes9:309.547.52,470
45 minutes (assumed above)9:159.2546.252,405
60 minutes9:009452,340

Overtime and days per week for 7 PM to 5 AM

Overtime here means weekly paid hours above 40, with a 1.5 times multiplier shown as pay-equivalent hours. Your contract or local law may define overtime differently, for example by day. At five days you are 6.25 hours over the threshold every week.

Weekly hours and overtime for 7 PM to 5 AM
Days workedPaid hoursRegular (up to 40)Overtime (over 40)Pay-equivalent hours at 1.5x
3 days a week27.7527.75027.75
4 days a week3737037
5 days a week46.25406.2549.38
6 days a week55.54015.563.25
7 days a week64.754024.7577.13

Gross pay before tax for 7 PM to 5 AM at five days a week, using round hourly rates chosen only to show the arithmetic. They are illustrative, not market data, and ignore overtime premiums.

Illustrative gross pay for 7 PM to 5 AM
Hourly ratePer dayPer weekPer monthPer year
$15 an hour$138.75$693.75$3,006.25$36,075.00
$20 an hour$185.00$925.00$4,008.33$48,100.00
$25 an hour$231.25$1,156.25$5,010.42$60,125.00
$30 an hour$277.50$1,387.50$6,012.50$72,150.00

7 PM to 5 AM month by month in 2027

The average month above hides real differences: 2027 has 261 weekdays, so working every weekday of 7 PM to 5 AM adds up to 2,414.25 paid hours (2414:15) before any leave or public holidays. The shortest month has 20 weekdays, or 185 hours, and the longest has 23, or 212.75 hours.

Paid hours per month for 7 PM to 5 AM, Monday to Friday, 2027
MonthDecimal hoursHours and minutes
January (21 weekdays)194.25194:15
February (20 weekdays)185185:00
March (23 weekdays)212.75212:45
April (22 weekdays)203.5203:30
May (21 weekdays)194.25194:15
June (22 weekdays)203.5203:30
July (22 weekdays)203.5203:30
August (22 weekdays)203.5203:30
September (22 weekdays)203.5203:30
October (21 weekdays)194.25194:15
November (22 weekdays)203.5203:30
December (23 weekdays)212.75212:45

A week of 7 PM to 5 AM shifts, day by day

Working consecutive days starting on Monday, you pass 40 paid hours on Friday, after 5 shifts, and every hour after that is overtime. The running total adds one paid shift per day.

Running weekly hours for 7 PM to 5 AM
DayPaid that dayRunning totalAgainst a 40-hour week
Monday9.259.2530.75 to reach 40
Tuesday9.2518.521.5 to reach 40
Wednesday9.2527.7512.25 to reach 40
Thursday9.25373 to reach 40
Friday9.2546.256.25 overtime
Saturday9.2555.515.5 overtime
Sunday9.2564.7524.75 overtime

Planning figures for 7 PM to 5 AM

These figures turn the daily paid time into the numbers people usually need for contracts, leave and targets. Leave is shown as 20 working days purely as an illustration; use your own entitlement.

Planning figures for 7 PM to 5 AM
MeasureValue
Full-time equivalent at 5 days (40 hours = 1.0)1.16
Share of the 168-hour week spent at work, break included1,785.7%
Paid hours in 20 days of annual leave185
Working days to reach 100 paid hours11
Working days to reach 1,000 paid hours109
Weeks to reach 1,000 paid hours at 5 days21.6
Paid hours in a year after 20 days of leave (261 weekdays in 2027)2,229.25

About the 7 PM to 5 AM shift

Seven in the evening to five in the morning is a ten-hour night shift used in factories and distribution centres that want one long block rather than a split. After a 45-minute break the paid time is 9.25 hours, so a five-night week is 46.25 hours, well above a standard 40.

Questions about 7 PM to 5 AM

How many hours is 7 PM to 5 AM?

10 hours on the clock, crossing midnight, and 9.25 paid hours after a 45-minute unpaid break.

Is five nights of 7 PM to 5 AM over 40 hours?

Yes. Five nights is 46.25 paid hours, which is above 40. Four nights is 37.

How many paid hours a year is 7 PM to 5 AM at four nights a week?

37 hours a week times 52 is 1,924 hours a year, before leave.

Compare 7 PM to 5 AM with similar shifts

  • 11 PM to 6:30 AM: 6.75 paid hours a day, 2.5 fewer hours a day than 7 PM to 5 AM, and 33.75 hours over five days.
  • 10 PM to 6 AM: 7.25 paid hours a day, 2 fewer hours a day than 7 PM to 5 AM, and 36.25 hours over five days.
  • 7 PM to 7 AM: 11.25 paid hours a day, 2 more hours a day than 7 PM to 5 AM, and 56.25 hours over five days.

Last updated 19 October 2026. Formulas and tests: methodology.